To construct the areas behind the berth, we built deep foundations from a floating structure and installed prefabricated reinforced concrete elements. Using two pile drivers, we drove 273 steel piles measuring 52 metres in length without the tip into the ground and built some temporary structures on the piles. The concrete structure is made of two types of concrete: the load-bearing course and surface course are made of an eruptive aggregate additive and white slag. We also installed a 35 m tall light tower.

Delivery date: 2014
Project location: Port of Koper
Final value of the project: EUR 8,390,000
Investor/Client: Luka Koper d.d.