Arrangement of Jernejev Kanal

Construction year
2024
Client
OKOLJE Piran d.o.o.
Location
Piran
Category
Marine Construction
01 / PROJECT DESCRIPTION

About the project

The load-bearing structure of the boardwalk is constructed on steel piles, which are filled with concrete at the installation site. A prefabricated wooden structure, delivered and assembled in segments, is then attached to them. The boardwalk is designed on two levels – the upper level is intended for pedestrians, while the lower level provides access to vessels. The total length of the boardwalk is just over one kilometer, and it includes seven piers and a total of 280 mooring berths.