⊕ References / Building Construction

Autocamp Savudrija

Construction year
2025
Client
Plava laguna d.d.
Location
Savudrija
Category
Building Construction
01 / PROJECT DESCRIPTION

About the project

The renovation of Camp Savudrija included the construction of a modern swimming pool complex, the renovation of the restaurant with terrace, and the complete refurbishment of sanitary building No. 3. The pool complex consists of a large main swimming pool, a smaller pool with small water slides, and a separate children’s pool with shallow water and water play features. A spacious sunbathing terrace with urban equipment was arranged around the pools, complemented by a children’s playground and a multipurpose sports field. As part of the project, the restaurant with a sea-view terrace was also renovated, including a modern kitchen and service area adapted to high catering demands. Sanitary building No. 3 was fully renovated and includes new toilets, showers and washbasins, a baby changing room, facilities adapted for disabled persons, a chemical toilet, and separate areas for laundry and dishwashing.