
⊕ References / Marine Construction
Extension of the town port of Sali on the island of Dugi otok.
01 / PROJECT DESCRIPTION
About the project
The extension included the construction of a new mooring quay with a total length of nearly 150 m, along with a landscaped hinterland area for safe and functional use of the port. An important part of the investment was also the construction of the main breakwater, 116 m long, intended to provide protection against wave action. As part of the project, all necessary utility and energy installations were carried out, including water supply, drainage, a hydrant network, and electrical installations.
Technical data
- New quay wall with a length of almost 150 m
- Construction of a 116 m main breakwater
- Installation of utility and energy systems