Koper Fishing Pier.
01 / PROJECT DESCRIPTION
About the project
The Koper fishing pier had settled due to the action of the sea, which, combined with rising climate/sea levels, led to partial flooding of the pier. We carried out new foundation works for the pier using GEWI micropiles up to 25 meters long. Using stone blocks, we raised the height of the wall's front face. The existing worn stone pavement was repaired and replaced with a new pavement of limestone and sandstone, covering a total area of 3,500 m². By installing stone blocks, we raised the protective stone wall.
Technical data
- New pier foundation with GEWI micropiles up to 25 m
- Raising of the protective stone wall
- Restoration of stone pavement covering 3500 m²