⊕ References / Marine Construction
Reconstruction and development of the port infrastructure in the city of Zadar-Poluotok.
01 / PROJECT DESCRIPTION
About the project
The construction works included the reconstruction of the coastal (quay) wall with a total length of nearly 906 m, as well as the renovation and extension of the pier. The pier was extended to the same dimensions it had when originally built approximately a hundred years ago. As part of the project, the Liburnian Riva (coastal promenade) was also renovated over a length of about 600 m, together with an improved coastal structure, a drainage system, and new utility and energy infrastructure.
Technical data
- Reconstruction of 906 m of coastal wall
- Restoration and extension of the pier to original dimensions
- Development of 600 m of Liburnska coast