⊕ References / Marine Construction

Reconstruction and development of the port infrastructure in the city of Zadar-Poluotok.

Construction year
2023
Client
Zadar Port Authority
Location
Zadar
Category
Marine Construction
01 / PROJECT DESCRIPTION

About the project

The construction works included the reconstruction of the coastal (quay) wall with a total length of nearly 906 m, as well as the renovation and extension of the pier. The pier was extended to the same dimensions it had when originally built approximately a hundred years ago. As part of the project, the Liburnian Riva (coastal promenade) was also renovated over a length of about 600 m, together with an improved coastal structure, a drainage system, and new utility and energy infrastructure.