Koper fountain standard

We carried out the excavation and earthworks and built the ground slab for the new fountain at the existing roundabout on one of the principal radial roads of Koper, also arranging the necessary installations.Delivery date: 2009 Project location: Koper Final value of the project: EUR 480,000 Investor/Client: Municipality of ...

Continue Reading

Logatec sanitary sewerage system standard

The construction of the Logatec sanitary sewerage system began in 2013. The project was finished in 2015. As part of this project, our company constructed the vacuum sewerage system in Martinj hrib and the ceramic sewerage system in the settlements of Gorenji Logatec and Kalce. The scale of the project was vast because over 15 km of sewers had to be built in very hard rock, in some parts reaching even category 7 hardness. The construction was also demanding because the entire sewerage system was being built in a densely populated area. The construction works went according to plan and the project was finished within the contractual deadline.Delivery date: ...

Continue Reading

Road-rail bridge over the Rižana River standard

We built a new 45 m long and 11 m wide bridge over the Rižana River next to the existing railway bridge. The foundation of the bridge consists of four posts placed on deep foundations with 30 m long steel piles. The construction of the bridge is designed partly as a continual reinforced concrete slab under the railway track and partly as a shallow plate under the roadway. The bridge is used for rail traffic as well as road transport serving the Port of Koper.Delivery date: 2014 Project location: Port of Koper Final value of the project: EUR 785,000 Investor/Client: Luka Koper ...

Continue Reading

Podgrad sewerage network standard

Together with our partners, we built around 4,000 m of sewers along with a water treatment plant and the corresponding structures on the Podgrad sewerage network. We also carried out the necessary plumbing and electrical installations. A total of 1,200 m of the main line ran through the town's main road. Because of the roadblock, the construction works had to be completed as soon as possible so rock was excavated ranging to a depth of 2.8 m using a cold planer.Delivery date: 2013 Project location: Podgrad Final value of the project: EUR 454,118.27 Investor/Client: Municipality of Ilirska ...